home *** CD-ROM | disk | FTP | other *** search
/ Developer Source 18 / Developer Source Volume 18 (I-MODE Publications, Inc.)(2000).iso / softw / 8a2 / 1p28.gif < prev    next >
Graphics Interchange Format  |  1999-03-17  |  6KB  |  369x249  |  4-bit (4 colors)
Labels: text | line | diagram | parallel | font | plot
OCR: Testing At What Cost? There's always a trade-off between the level risk reduction and the level of testing effort required. Picking the right level of testing effort is not a black or white decision; it is a sliding scale based on an organization's level of risk tolerance; TESTING EFFORT Optinal Balance Cost Too High Risk . Risk Too High COST :www.w